To view all publications and deliverables please leave the field below blank and just press search.

 

View Deliverables


Found 45 Item(s)

Click on a work package/folder to jump straight to it:

Database of Thermal Requirements

D 1.3 Data on thermal requirements for insects and mites

Description: When using the data, please refer to: Jarošík V., Honěk A., Magarey R.D., Skuhrovec J., 2011: Developmental database for phenology models: related insect and mite species have similar thermal requirements. Journal of Economic Entomology, 104: 1870-1876; DOI: http://dx.doi.org/10.1603/EC11247

Date Published on PRATIQUE website: 20/04/2012

Document: Thermal database for PRATIQUE 19-9-2011.xls

Appendices

D1.5 Appendices Asian pests.doc

Description: Appendices with species lists

Date Published on PRATIQUE website: 28/07/2011

Document: D1.5 Appendices Asian pests.doc

Deliverables

D 1.1 Collection of schemes for pest risk analyses

Description: Collection of schemes for pest risk analyses and related topics used worldwide with examples of best practice accessed as pdfs via a project web page

Date Published on PRATIQUE website: 30/10/2009

Document: D 1.1 Risk Analysis Schemes FINAL.doc

D 1.1 List of PRAs for public access

Description: D 1.1 List of PRAs for public access

Date Published on PRATIQUE website: 31/10/2009

Document: List of PRAs 25 Oct public access links.xls

D 1.2 & 1.3 Inventory and description of all datasets...

Description: PD No. 1.2. Inventory and description of all datasets needed for PRA in the EU that are currently available provided as tables and accessed via hyperlinks in structured project webpages and PD No. 1.3. Key datasets in a variety of formats accessible via hyperlinks in structured project web pages with a trend analysis and available for integration into the PRA scheme developed in WP6

Date Published on PRATIQUE website: 30/10/2009

Document: D 1.2 and 1.3 Datasets FINAL.doc

D 1.4 Dataset gap analysis

Description: Report on the gaps in key data required to undertake PRAs

Date Published on PRATIQUE website: 30/10/2009

Document: D 1.4 Dataset Gaps FINAL.doc

D1.5 Asian pests of European woody plants

Description: A dataset of potential Asian pests of selected woody plants not yet introduced into Europe supplied as a table and accessed via hyperlinks in a project web page.

Date Published on PRATIQUE website: 28/07/2011

Document: D1.5 Asian pests of European woody plants.doc

D1.6 Protocol for listing pests before introduction

Description: A written protocol to establish lists of potential plant pests before they are introduced into a new continent

Date Published on PRATIQUE website: 28/07/2011

Document: D1.6 Protocol for listing pests before introduction.doc

Deliverables

D 2.1 Review impact assessment methods

Description: Review of impact assessment methods for pest risk analysis

Date Published on PRATIQUE website: 30/10/2009

Document: D 2.1 Impact assessment methods FINAL.doc

D 2.2 Species traits analysis Appendix

Description: D 2.2 Appendix Species Traits Analysis

Date Published on PRATIQUE website: 05/04/2010

Document: D 2.2 Traits analysis Appendix FINAL.doc

D 2.2 Species traits analysis Report

Description: Final draft for D 2.2, species traits analyses with appendices in a seperate file

Date Published on PRATIQUE website: 27/10/2009

Document: D 2.2 Traits analysis Final April 2010.doc

D2.3 A set of written indicators and a written protocol

Description: D2.3 A set of written indicators and a written protocol for scoring levels of impact in the EPPO PRA scheme accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 26/07/2011

Document: D2.3 Indicators and protocol for assessing impact.doc

D2.4 A manual and computerized consistent framework for assessing the vulnerability of receptor environments

Description: D 2.4 A manual and computerized consistent framework for assessing the vulnerability of receptor environments

Date Published on PRATIQUE website: 28/06/2011

Document: D2.4 Vulnerability assessment.doc

D2.5 A manual and computerized module for calculating economic, environmental and social impacts

Description: D2.5 A manual and computerized module for calculating economic, environmental and social impacts; the quantitative economic impact assessment module

Date Published on PRATIQUE website: 26/07/2011

Document: D2.5 Annex 1 Quantitative Economic Impact Model.xls

D2.6 Models for pest spread

Description: A report comparing the advantages and disadvantages of different approaches for creating a generic integrated model for pest spread and impacts

Date Published on PRATIQUE website: 29/06/2011

Document: D2.6 Models for pest spread.doc

D2.7 A generic integrated model for pest spread and impacts

Description: D2.7 A generic integrated model for pest spread and impacts

Date Published on PRATIQUE website: 26/07/2011

Document: D2.7 Generic integrated framework.doc

Deliverables

D3.1 Protocol on Consistency

Description: Deliverable 3.1 of Workpackage 3, protocol on consistency

Date Published on PRATIQUE website: 25/07/2011

Document: D3.1 Protocol on consistency.doc

D3.2/3.4 Best practice for quantifying uncertainty and summarising and communicating risk

Description: D 3.2 Protocol for quantifying and communicating uncertainty in the PRA scheme accessed via a hyperlink in a project web page and integrated into the web-based EPPO DSS for PRA; D 3.4 Protocol for summarising and communicating overall risk in the PRA scheme accessed via a hyperlink in a project web page and integrated into the web-based EPPO PRA scheme

Date Published on PRATIQUE website: 19/07/2011

Document: D3.2 D3.4 Uncertainty Summarising Risk.doc

D3.3 Protocol for mapping endangered areas

Description: Protocol for mapping endangered areas taking climate, climate change, biotic and abiotic factors, land use and economic impacts into account

Date Published on PRATIQUE website: 23/06/2011

Document: D3.3 DSS endangered area.doc

Deliverables

D 4.1 Pathway analysis review

Description: Review of pathway analysis in PRA

Date Published on PRATIQUE website: 18/11/2009

Document: D 4.1 Pathway analysis FINAL2.doc

D 4.2 Systems Approach Review

Description: Review of Systems Approaches in PRA

Date Published on PRATIQUE website: 05/11/2009

Document: D 4.2 Systems approach FINAL.doc

D4.2 Systems approach review

Description: UPDATE: Review of methods for systems approaches in PRA accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 27/07/2011

Document: D4.2 Systems approach review.docx

D4.3 Specification for neural network application in PRA accessed via a hyperlink in a project web page

Description: Specification for neural network application in PRA accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 07/07/2011

Document: D4.3 Neural network application.doc

D4.4 Specification for Response Consistency

Description: Specification for response consistency methodology within the European PRA scheme accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 27/07/2011

Document: D4.4 Response Consistency.docx

D4.5 Systems approach specification.doc

Description: Specification for systems approach component analysis in PRA accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 27/07/2011

Document: D4.5 Systems approach specification.doc

D4.6 Pathway Risk Analysis Framework including Systems Approach

Description: Pathway risk analysis module, with a protocol for neural networks accessed via a hyperlink in a project web page

Date Published on PRATIQUE website: 27/07/2011

Document: D4.6 Pathway Risk Analysis Framework including Systems Approach.docx

Deliverables

D 5.1 Review of Eradication Campaigns Appendices

Description: Meta-analysis of eradication campaigns

Date Published on PRATIQUE website: 05/04/2010

Document: D 5.1 Eradication campaigns Appendices FINAL.doc

D 5.1 Review of eradication campaigns Report

Description: Review of eradication and containment campaigns

Date Published on PRATIQUE website: 24/09/2009

Document: D 5.1 Eradication campaigns Report FINAL April 2010.doc

D5.2 A protocol for the cost: benefit analysis of eradication and containment measures during outbreaks

Description: A protocol for the cost: benefit analysis of eradication and containment measures during outbreaks

Date Published on PRATIQUE website: 23/06/2011

Document: D5.2 Cost benefit analysis protocol.doc

D5.3 A decision support scheme that generates contingency plans and prioritises action during outbreaks

Description: A decision support scheme that generates contingency plans and prioritises action during outbreaks

Date Published on PRATIQUE website: 07/07/2011

Document: D5.3 DSS for outbreaks.doc

D5.4 A review of pest surveillance techniques for detecting new pest incursions and surveying ongoing outbreaks with recommendations for best practice

Description: A review of pest surveillance techniques for detecting new pest incursions and surveying ongoing outbreaks with recommendations for best practice

Date Published on PRATIQUE website: 07/07/2011

Document: D5.4 Surveillance review.doc

D5.5 A report on the field-testing of innovative trapping systems following new pest surveillance guidelines

Description: A report on the field-testing of innovative trapping systems following new pest surveillance guidelines

Date Published on PRATIQUE website: 07/07/2011

Document: D5.5 Innovative trapping.doc

Deliverables

D 6.1 Provisional list of species to develop and test deliverables

Description: Provisional list of species to develop and test deliverables

Date Published on PRATIQUE website: 30/10/2009

Document: D 6.1 Species list FINAL.doc

D6.2 Provide one training workshop to test project deliverables

Description: Provide one training workshop to test project deliverables

Date Published on PRATIQUE website: 07/07/2011

Document: D6.2 Workshop on PRA.doc

D6.3 Report on the validation of outputs for WPs 1-5

Description: Report on the validation of outputs for WPs 1-5

Date Published on PRATIQUE website: 07/07/2011

Document: D6.3 Validation of outputs.doc

D6.4 Validated web-based scheme

Description: Production of a validated web-based PRA Scheme with a manual and examples of best practice

Date Published on PRATIQUE website: 27/07/2011

Document: D6.4 Validated web-based scheme.docx

D6.5 Consolidation of outputs

Description: Consolidation and dissemination of project outputs with a manual and examples of best practice

Date Published on PRATIQUE website: 27/07/2011

Document: D6.5 Consolidation of ouputs.docx